A small working example · synthetic job data

The estimate was accepted.
What reaches the crew?

A roofing quote changes twice before approval. The production job must retain the accepted revision, exact scope, property and amount.

This example creates a job only from an accepted, complete quote. Change the sample to see which missing details should stop the handoff.

Sample accepted quote

The rule in action

Keep the sale
traceable.

Ready to create a job from accepted revision 3.
Source quote
Q-104 · revision 3
Customer and property
Northbank Roofing · 18 Oak Street
Accepted amount
$18,450
Production stage
Ready to schedule

Accepted scope: Replace 21 squares; ice barrier; remove old shingles

This check runs locally in your browser. It does not send data, create a job or represent a live roofing system.

Acceptance checks

Do not let the handoff rewrite the deal.

Stop before creation

No accepted revision means no production job. A blank customer, work property, scope, invalid amount or missing revision needs a visible correction, not a partial record.

Keep a trace back

The job points to the source quote and preserves its accepted revision, agreed amount, customer, property and scope. Scheduling, deposits, materials and change orders need separate rules.

What this proves

A small, testable handoff rule with explicit stop conditions and a source link back to the accepted quote. The synthetic case can be repeated and challenged.

What a live system still needs

Permissions, multiple properties, signed documents, attachments, deposits, tax, material lists, change orders, weather moves, notifications, audit history and export reconciliation need their own design and tests.

Use this in your software comparison

What gets lost between sale and crew?

Take the handoff rules you tested here into a vendor demo. Ask them to show a real change from accepted estimate through to the field team.

Read the roofing software guide ↗

Read the roofing software guide